Home Page Sitemap Contact فارسی
NPK
NPK -Niroo Pardazesh Kavir
 
npk
npk

Projects

Review and Renewal of Besat Power Plant Protection Relay Settings

npk

Modifications in old power plants design, gradual changes in electromechanical relays behavior and vast increase in network short circuit level and, moreover, availability of numerical relays with versatile auxiliary functions reveals the necessity for review and renewal of relay settings of generating units and internal system. Niroo Pradazesh Kavir signed a consultancy contact with the operator and maintenance authority of Besat power plant to revise all the protection setting and coordination of three generating units, internal network and DC system in 2011. The system was studied during four separate phases i.e. data collection and validation, modeling and simulation of the system in steady state, review of current protection status and shortcomings and recommendation for new relays and settings.

npk

Cooperation of members with IGMC in projects

  • Participation in "Extensive Study of Iranian HV Network" Modeling, steady state and dynamic analysis, protection and coordination
  • Dynamic study to investigate causes of Iranshahr power plant damages during out of step conditions
  • Insulation coordination analysis of Sirjan 400 kV substation based on IEC 71
npk

Cooperation of members with KREC in projects

  • Extensive analysis of protection system of Kerman regulated power system
  • Grounding system redesigning and reinforcement project for Kerman 1 substation
  • Aging analysis for high voltage transmission transformers based on dissipation factor measurement
npk 
npk  npk  npk 
 
Back to top